Branch Report: 29th April 2009

Site Visit

Ffos-Y-Fran O.C.C.S.

The South Wales Branch held a site visit on Wednesday 29th April 2009 at Miller Argent`s Ffos-Y-Fran Open Cast Coal Site, which was a very popular visit attended by 28 Branch Members.

 The joint presentation was given by Martin Lumsden of Finning Ltd and Brian Rostron of Miller Argent outlining the history of the site up to the planning stages and the start of the Ffos-Y-Fran site.

 Finning supply a fleet of machines on the site and are working in partnership with Miller Argent.

The site is phase 3 of the East Merthyr Land Reclamation Scheme, this agreement was agreed upon in 1993 by British Coal, Mid Glamorgan County Council and Merthyr Tydfil Borough Council, the planning application for phase 3 was submitted on 3rd May 2003, the public inquiry was in September 2004 and the planning consent was granted on 11th April 2005.

 The site will create approximately 600 jobs, 200 direct jobs & 400 indirectly.

The duration of the site is estimated at 21 years, 11 – 14 years coaling, 2 years restoration and 5 years aftercare.

The total amount of coal to be recovered is estimated at 11,000,000 tons with an annual output between 750,000 to 1,000,000 tons with 1,000 acres of land being reclaimed.

 Finning`s involvement began in 2001, when they were first approached, between 2002 – 2005 they became increasingly involved in fleet production studies and various cost effective packages. Early in 2006 the fleet size & mix was established, September 2006 a Letter of Intent was given to Finning and the contract was signed in April 2007.

 The fleet of machines supplied by Finning is listed below :

 28 x Caterpillar 777F Off Highway Trucks

3 x Caterpillar D9T Track Type Tractors

3 x Support Equipment (Fuel & Water)

2 x 824H Caterpillar Tyre Dozers

3 x 324DL Caterpillar Hydraulic Excavators

2 x 325DL Caterpillar Hydraulic Coal Shovels

1 x 33ODL Caterpillar Hydraulic Excavator

1 x 966H Caterpillar Front End Wheel loader

1 x 980H Caterpillar Front End Wheel loader  

 Finning have a workshop facility on site with 4 service engineers, an Operation Manager, Engineering Team Leader and a project planner.

 After the presentation there was a trip around the site to view the machines in operation which was followed by a buffet in the Site Training Centre.